BAHRAIN – (ALBA – ALUMINIUM BAHRAIN)
 
 
ETA-PPD’s division has executed a turnkey contract for the design, supply, installation, testing & commissioning of 220/33kV Gas Insulated Switchgear (GIS) Substation & Associated cabling works from Aluminium Bahrain BSC (ALBA). This is one of the largest 220kV substation project commissioned by ETA-PPD in the Gulf. This substation contains 34 bays of 220kV GIS, 12 bays of 33kV GIS, Control & Protection system, transformers, 220kV GIS, 132kV, 33kV & 11.5kV cabling, SCADA, SCS and associated works. The 220kV GIS was energized on schedule for start-up and commissioning of ALBA’s new Power Station 4 and Potline 5 project.

The 220kV network is the point of connection and load transfer between the new Power Station 4, Line 5 Smelter, existing 132kV system, 33kV system, Power station 1- 3. This also interconnects with the national grid.

In addition to SCS & BCUs, the contract also includes the supply, installation, testing and commissioning of a replacement power distribution SCADA and energy management system to provide remote control and monitoring of the power systems in Alba’s control rooms and by MEW for the 220kV power export including replacement of obsolescent RTUs.

 
     
 
KAHRAMAA – QATAR
 
 

ETA-PPD has Undertaken and successfully completed the 132/66kV Overhead Transmission Line Tower Foundation Refurbishment Work Under Complete Live Line Condition.

ETA-PPD also executing;

  • HV/LV Cable Extension In Distribution Network
  • Distribution Of Overhead Line And Associated Works.
  • Sub-Contract Work To LG Cables-Kore For Laying 220kV, 132kV Pilot & F.O. Cables And Accessories (Route Length 220kV-18.6 Kms And 132kV-7.6 Kms)

 

 
     
 
BANGLADESH POWER DEVELOPMENT BOARD, DHAKA
 
 

ETA-PPD gained international status by obtaining a prestigious World Bank financed contract from Bangladesh Power Development Board for construction of 16 Nos. 132kV Outdoor Substations. The consultants for this Project were M/s. Electricite De France. ETA-PPD is the first UAE Company to undertake such projects in Bangladesh.

The scope of works include Design, Supply, Installation, Testing & Commissioning of 16 nos. 132/33kV Outdoor substation including extension of existing Substation with 25 nos. 132kV Switchgear bays, 2 nos of 15/20 MVA Transformer bays along with control & PLC protection. Including civil works in one control building.

 

 
     
 
THAILAND EGAT - ELECTRICITY GENERATING AUTHORITY OF THAILAND (EGAT)
 
 

ETA-PPD has also executed to turnkey projects for Electricity Generating Authority of Thailand (EGAT) for constrution of 27 Nos. of 115kV Outdoor Substations in regions 2 & 4 under contract ATP 10 and in regions 1 & 3 under contract ATP 11.

The scope of works include Design, Supply, Installation, Testing & Commissioning of 11 Nos. New 115kV Substation & extension as 16 Nos. 115kV Substation in the Region.

 
     
 
INDIA
JPPL – JALKHERI POWER PROJECT LTD – FOR PUNJAB STATE ELECTRICITY BOARD
 
 
The division has entered the huge indian power generating market under privatization and has taken up the straw bio-project – the first 10 mw rice sraw fired power plant on a 10 year lease. It is also in the process of developing identical biomass projects, the future power generation projects to meet the dwindling level of work fossil fuels.
 
     
 